Vientiane 500KV Ring Grid Power Transmission Project in Laos

Publication Date:2016-03-07

Vientiane 500KV Ring Grid Power Transmission Project in Laos: It comprises construction of a 53.5km double-circuit 500KV power transmission line and a 41.5km double-circuit 230/115KV power transmission line, and the expansion of two 500KV substations and two 230KV substations. CET has signed an EPC contract for this project.